From first measure to aftercare
A good installation starts before the fitting date. We agree the product route, survey the openings, confirm the manufacture specification and write the fitting scope down. The final survey, access and product lead time control the programme — not a guessed date in a sales conversation.
Our promise
A written, itemised price. No manager discount call. No pressure to decide tonight. No outsourced fitting.
Trading locally since 2010
Public feedback plus active industry certification.
Google reviews
4.7
out of 5
196 Google reviewers sharing real experiences.
Read all Google reviewsCertass · Certified Competent
477
customerreviews
Active TrustMark + Domestic Glazing certification.
Account 14-4642 · Active
The working sequence
Photographs, rough sizes and the brief establish the sensible products and a written quotation.
We check manufacture sizes, openings, cills, access, threshold, ventilation, structural notes and making-good scope.
System, colour, glass, hardware and opening drawings are confirmed before our named factory route builds to order. Lead time is confirmed when the specification is signed off.
Removal, fitting, sealing, adjustment and agreed making good follow the order scope. Waste handling is agreed on the written quote.
Operation, keys, care and guarantee paperwork are handed over; any snag is recorded rather than hidden.
No-Pressure Promise
No commission salespeople. No countdown. No “today-only” discount. No unexplained finance shortcut.
We give you a written scope and price, answer questions and let you compare. If the survey changes the product or building work, we explain the change before asking you to proceed.
Get a written price →
Before fitting day
Parking, carrying route, furniture, floor protection and any scaffold or lifting requirement.
Existing frames, trims, boards, blinds, alarms and unknown finishes are identified where visible.
External seal, internal trim, plaster or render making good and decoration boundaries are written down.
Straight answers
Programme, making good and survey changes explained plainly.
The programme is confirmed after survey. Product type, quantity, access and building work change the answer.
The quotation defines the included internal and external making good. Decoration and specialist finishes are scoped separately when needed.
We agree the access plan before fitting. Blind removal, curtains, furniture and fragile items remain your responsibility unless quoted otherwise.
We revise the drawing, product or scope and explain any price or programme effect before manufacture.
Straight answers
Installation questions before you book fitting.
The programme is confirmed after survey. Product type, quantity, access and building work change the answer.
The quotation defines the included internal and external making good. Decoration and specialist finishes are scoped separately when needed.
We agree the access plan before fitting. Blind removal, curtains, furniture and fragile items remain your responsibility unless quoted otherwise.
We revise the drawing, product or scope and explain any price or programme effect before manufacture.
Talk to the team
Tell us what you need and attach photographs when we reply. We will confirm the next sensible step.
Talk to the team
Tell us what you need — we will confirm the next step.